|
This hanger is specialized to hang and convey DN1000~DN2600 cast iron pipes casted from hot mold.
Main function introduced as bellow:
Conveying pipes right after casting to annealing furnace as soon as possible
As temperature of pipes is still 700℃~800℃ right after casting out and pipes is easy to be deformed, it is imperative to make pipes rotate itself along with its’ length axle during hanging and conveying

Main purposes are:
In order to reduce cost of production, calorific value remained in pipes after casting has to be re-utilized, thus time of heating in annealing process will be shortened a lot and utilization of fuel will be improved greatly.
Pipes pulled from centrifugal casting machine should be moved to next process sooner in order to improve working efficiency of centrifugal casting machine.
TEL:+86-010-64882533 FAX:+86-010-64883512 E-mail:xuejier@caams.org.cn |